Manifest Filing Knowledge Company News Industry Updates Bonds FAQ US FMC Bonds Knowledge Insurance Knowledge
UAE MPCI Filing Status: How to Resolve RFI, DNL and PSF Before Loading
Direct Answer
When a UAE Maritime Pre-Load Cargo Information (MPCI) filing receives an RFI, DNL or PSF response, the freight forwarder must identify the reason and take the appropriate action before assuming the shipment is ready for loading.
The National Advance Information Center (NAIC) uses different responses for different situations:
-
ACT — Assessment Complete: The shipment has passed the assessment and is approved to proceed.
-
ACW — Assessment Complete with Warnings: The shipment is approved, but comments identify issues that should be addressed in future filings.
-
RFI — Request for Information: Additional information or supporting documents are required before the assessment can be completed.
-
DNL — Do Not Load: The shipment is not approved for loading.
-
PSF — Pending Sub-Filing: The Master B/L assessment is waiting for the required associated House B/L filings.
-
EXP — Filing Expiry: The filing has expired because required actions were not completed within the applicable system timeframe.
These statuses are not interchangeable. In particular, an accepted electronic message is not necessarily an approved shipment.
The UAE MPCI program has been mandatory since October 1, 2026, following the end of the transition period. Applicable containerized maritime cargo destined for, transiting through or transshipping via the UAE must meet the relevant filing requirements.
Official sources: NAIC Official Portal and NAIC MPCI Business Specification Document.
Navigator International supports freight forwarders with UAE MPCI filing coordination and related international manifest filing services.
1. Why Does an MPCI Filing Need More Than a Submission Confirmation?
The MPCI process includes two distinct stages.
Stage 1: Message validation. The system checks whether the submitted electronic message follows the required format and technical specifications.
Stage 2: Shipment assessment. NAIC assesses the submitted cargo information and returns a response indicating whether the shipment can proceed, requires additional information or must not be loaded.
A successful message validation confirms that the message has been received and processed in the required format. It does not by itself establish that the cargo has received loading approval.
For freight forwarders, this distinction is critical. The operations team should monitor the assessment response, not merely confirm that the filing was transmitted.
2. What Does ACT Mean?
ACT, or Assessment Complete, indicates that the shipment has been assessed and approved to proceed.
For a direct shipment, this generally means the filing has passed the applicable assessment.
For a consolidated shipment, however, the status of the Master B/L and the associated House B/Ls must be considered together.
NAIC's business specification explains that:
-
An ACT response on a House B/L does not automatically mean the Master B/L has been approved.
-
The Master B/L remains pending until all associated House B/Ls receive ACT.
-
An ACT response on the Master B/L indicates that the underlying House B/Ls have received the required ACT responses.
Therefore, an NVOCC should not rely solely on its own House B/L status when the shipment is part of a consolidation.
Practical check: Before confirming readiness to load, verify the relevant Master B/L and all associated House B/L assessment statuses.
3. What Should You Do if MPCI Returns RFI?
RFI means that NAIC requires additional information or a supporting document before completing its assessment.
The response may relate to incomplete, inaccurate or insufficiently specific information. NAIC may also request documents such as an invoice, certificate of origin or packing list to support its review.
The correct response depends on what the RFI requests.
Step 1: Read the Exact Request
Identify the missing information, incorrect data or supporting document requested by NAIC.
Do not make unrelated changes to the bill of lading simply because the filing received an RFI.
Step 2: Verify the Source Documents
Compare the filed information against the relevant commercial and shipping documents.
Depending on the request, check:
-
Shipper and consignee details
-
Cargo description
-
HS code
-
Bill of Lading number
-
Port information
-
Container and seal details
-
Relevant supporting documents
Step 3: Submit the Requested Information
If additional data is required, submit an updated message containing the requested information.
If a supporting document is required, provide it through the applicable attachment service or process specified by NAIC.
Step 4: Monitor the New Assessment
After responding to an RFI, the shipment requires reassessment. Do not assume that submitting the missing information automatically changes the status to ACT.
For consolidated cargo, an unresolved RFI on a House B/L can keep the Master B/L pending. Likewise, an RFI on the Master B/L may prevent loading even if the associated House B/Ls have already received ACT.
Official source: NAIC MPCI Business Specification Document.
4. What Does DNL Mean, and Can the Cargo Still Be Loaded?
DNL means Do Not Load.
It indicates that the shipment has not been approved for loading because of significant issues or concerns, which may include security risks, incorrect or incomplete documentation, or legal violations.
When DNL is issued, the responsible parties must address the issue immediately. The shipping line must not load the affected shipment until the restriction has been resolved and the applicable approval has been obtained.
The effect of DNL depends on whether it applies to the House B/L or the Master B/L.
| DNL Status | General Effect |
|---|---|
| DNL on a House B/L | The affected House B/L and its Master B/L receive DNL; other House B/Ls under the same Master B/L are not automatically affected |
| DNL on a Master B/L | The DNL cascades to all associated House B/Ls, blocking the entire shipment from loading |
This distinction matters for consolidators.
If one House B/L receives DNL, the master co-loader should coordinate with the relevant parties to determine the appropriate corrective action. NAIC's specification describes the possibility of removing the affected House B/L and reconsolidating the remaining House B/Ls under a new Master B/L, where appropriate.
This should not be treated as permission to bypass the restriction. The parties must follow the applicable NAIC process and ensure that the revised shipment structure is correctly filed and assessed.
5. Why Is the Master B/L Still PSF When the HBL Has Been Submitted?
PSF means Pending Sub-Filing.
This status generally indicates that one or more required House B/L filings associated with a consolidated shipment have not yet been submitted or completed.
For example, a shipping line may submit the Master B/L and declare that associated House B/Ls will follow. If the required House B/L submissions are missing, the Master B/L assessment cannot be completed.
The shipping line or master co-loader should contact the responsible freight forwarder or sub-co-loader to complete the missing filings.
A useful troubleshooting sequence is:
-
Confirm the Master B/L number.
-
Identify all expected House B/Ls under the consolidation.
-
Check whether each House B/L has been submitted.
-
Confirm that the correct parent Master B/L is referenced.
-
Verify that the correct MPCI Party IDs have been used.
-
Check the assessment status of each House B/L.
-
Confirm whether all required sub-filings have been completed.
A House B/L may have been submitted but still not have the required assessment status. Therefore, checking only whether a message was sent is insufficient.
For a consolidated shipment, the Master B/L should be monitored until the required associated House B/L filings are complete and the final assessment is received.
6. What Happens When an MPCI Filing Expires?
EXP indicates that the filing has expired.
According to the NAIC business specification, a filing may expire when required actions, such as responding to an RFI or completing sub-filings, are not completed within the applicable system timeframe.
An expired filing is marked incomplete and requires resubmission of the shipment data to restart the filing process.
The practical lesson is to monitor outstanding responses rather than leaving an RFI or PSF unresolved.
Because MPCI is a pre-loading cargo information program, companies should address incomplete filings well before the applicable loading deadline rather than waiting for a filing to expire.
7. What Is the Difference Between ACW and RFI?
ACW means Assessment Complete with Warnings.
It indicates that the shipment is approved to proceed, but NAIC has identified comments that should be considered for future filings or operational improvement.
RFI is different: it means additional information or supporting documentation is required before the assessment can be completed.
| Status | Is the Shipment Approved? | Recommended Action |
|---|---|---|
| ACT | Yes | Verify the relevant bill-level status and proceed according to the shipment process |
| ACW | Yes | Review the comments and improve future data quality |
| RFI | Not yet approved to proceed | Supply the requested information or documents and await reassessment |
| DNL | No | Stop loading and resolve the issue through the applicable process |
| PSF | Assessment is incomplete because required sub-filings are missing | Coordinate the outstanding House B/L filings |
| EXP | Filing is incomplete because it expired | Resubmit the shipment data as required |
These distinctions help operations teams prioritize urgent problems and avoid treating every non-ACT response as the same type of error.
8. How Can Freight Forwarders Prevent MPCI Status Problems?
A reliable MPCI workflow should include both pre-submission checks and post-submission monitoring.
Before filing, verify:
-
Correct Bill of Lading number
-
Accurate shipper and consignee information
-
Complete cargo description
-
Applicable HS code
-
Correct port and routing details
-
Accurate container and seal information
-
Correct MPCI Party IDs
-
Correct parent bill reference
-
Clear responsibility for each House B/L
After filing, monitor:
-
Message validation responses
-
ACT or ACW assessment
-
RFI requests
-
DNL restrictions
-
PSF caused by missing House B/Ls
-
EXP notices
-
Updates to the Master B/L or House B/L
The official NAIC business specification emphasizes coordination between shipping lines, master co-loaders and sub-co-loaders. Each party must ensure that the bill it issues is properly filed and that the relationships between the associated bills are correctly represented.
9. How Navigator International Can Help
Navigator International supports freight forwarders and logistics companies with UAE MPCI filing coordination and related manifest services.
Depending on the company's operating model, support may include:
-
MPCI filing coordination
-
House B/L data checks
-
Master B/L and House B/L relationship checks
-
MPCI Party ID coordination
-
Filing status follow-up
-
RFI response coordination
-
DNL issue follow-up
-
PSF and missing sub-filing coordination
-
Bill of Lading update support
-
Related AMS, ISF, ACI and other manifest filing services
The service scope depends on the shipment, the responsible filer and the applicable NAIC process.
FAQ
Does a successful MPCI message submission mean the cargo can be loaded?
No. Technical message validation and shipment assessment are separate stages. The relevant assessment status must be checked.
What should I do when NAIC issues an RFI?
Review the exact request, correct or supplement the required information, provide supporting documents where requested and monitor the reassessment.
Can cargo be loaded with DNL status?
No. The shipment is not approved for loading while the DNL restriction remains in effect.
Why is the Master B/L still pending when all House B/Ls have been submitted?
Submission alone may not be sufficient. The associated House B/Ls must complete the required assessment process and receive the necessary statuses.
Does DNL on one House B/L affect every shipment under the Master B/L?
A House B/L DNL cascades to the Master B/L, but other House B/Ls under the same Master B/L are not automatically affected. A DNL on the Master B/L affects all associated House B/Ls.
What happens if the MPCI filing expires?
The expired filing is marked incomplete and requires resubmission of the shipment data to restart the process.


