Direct Answer
Yes. UAE MPCI filings can be updated after the initial submission, including after an ACT (Assessment Complete) response has been received.
According to the National Advance Information Center (NAIC) Business Specification Document, updating a bill of lading triggers a new shipment assessment. Updates may be submitted at different stages, including after vessel loading and, in certain cases, after the shipment has arrived in the UAE.
However, the first version of the bill of lading must be submitted within the applicable pre-loading deadline.
Freight forwarders and NVOCCs should pay particular attention to the following situations:
-
Incorrect shipper or consignee information;
-
Changes to cargo descriptions or shipment details;
-
Vessel or voyage changes;
-
Container rollovers and split shipments;
-
Consolidation or deconsolidation changes;
-
Switch Bills of Lading;
-
Responses to NAIC Requests for Information (RFI).
The key principle is that an amendment is not simply a correction in an internal system. It must be properly submitted to NAIC, reassessed and followed through to the latest assessment response.
1. Why Is MPCI Amendment Management Important?
MPCI (Maritime Pre-Load Cargo Information) is the UAE's advance maritime cargo information program administered by the National Advance Information Center (NAIC).
Since October 1, 2026, MPCI filing has been mandatory for applicable containerized maritime cargo destined for, transiting through or transshipping via the UAE.
For freight forwarders and NVOCCs, the filing process does not necessarily end after the first submission.
Consider a typical situation:
A freight forwarder submits a House Bill of Lading to NAIC and receives an ACT response. Two days later, the shipping line changes the vessel because of a schedule adjustment.
The original MPCI record may now contain outdated vessel or voyage information.
If the forwarder updates the shipping documents but does not synchronize the corresponding MPCI filing, the records may no longer reflect the actual shipment.
This creates a data consistency problem between the carrier, NVOCC, freight forwarder and NAIC.
The NAIC specification explicitly recognizes that amendments are part of normal maritime operations and provides procedures for handling different update scenarios.
2. Which Shipment Changes Require an MPCI Update?
The NAIC Business Specification Document identifies several common situations requiring updated bill of lading information.
A. Cargo Description or Shipment Data Corrections
Corrections may be necessary when the original filing contains:
-
Incorrect cargo descriptions;
-
Wrong shipper or consignee details;
-
Incorrect cargo measurements;
-
Revised shipment weights;
-
Inaccurate container information;
-
Other incorrect or incomplete shipment data.
For example:
An NVOCC initially submits a House Bill showing 500 cartons of electronic components. After the final warehouse tally, the confirmed quantity is 520 cartons.
The forwarder should review the final shipping documents and submit an updated version of the existing filing where required.
Do not assume that correcting the commercial invoice or internal shipping instructions automatically updates the NAIC record.
B. Consignee Changes
A consignee may change through a bill of lading endorsement, particularly when a negotiable bill is involved.
When the consignee information changes, the filing party should submit an updated version reflecting the new consignee details.
The updated record should be consistent with the revised transport documentation.
C. Vessel or Voyage Changes
Vessel and voyage changes can occur because of:
-
Vessel schedule adjustments;
-
Port omissions;
-
Rerouting;
-
Transshipment changes;
-
Operational delays;
-
Carrier arrangements.
The NAIC specification allows the filer to either:
-
Update the existing bill of lading with the revised vessel, voyage or bill of lading details; or
-
Cancel the existing filing and submit a new bill of lading.
The appropriate approach depends on the actual shipping arrangement and whether the original bill remains valid.
Freight forwarders should coordinate with the shipping line before changing the parent bill reference or submitting a replacement filing.
D. Consolidation and Deconsolidation Changes
In consolidated shipments, House Bills may initially be linked to one Master Bill but later reassigned to another.
For example:
An NVOCC originally consolidates several HBL shipments under Master B/L A. During transit, the consolidation arrangement changes and the House Bills are transferred under Master B/L B.
The NAIC specification identifies the following responsibilities:
-
Shipping line: Submit the new Master Bill of Lading.
-
Freight forwarder: Submit an updated House Bill reflecting the new Master Bill reference.
Both levels should be coordinated to maintain the correct filing relationship.
E. Switch Bills of Lading
A Switch Bill may replace the original bill of lading, often reflecting changes in the shipper or consignee.
NAIC recognizes Switch Bill updates and allows the updated filing to use the same or a different bill of lading number, depending on the arrangement.
The filer should identify the transaction as a Switch Bill update rather than treating it as an unrelated new shipment.
3. Can an MPCI Filing Be Amended After Receiving ACT?
Yes.
An ACT response indicates that the submitted filing has completed assessment and is approved to proceed with loading.
However, ACT does not mean that the filing can never be changed.
If the underlying shipment information subsequently changes, the filing party may submit an updated version.
There is an important distinction:
Initial submission: The first bill of lading version must be filed before loading within the applicable deadline.
Subsequent updates: NAIC permits updates at different stages, including after loading and after arrival in the UAE.
However, every amendment triggers a new shipment assessment.
This means that a previously approved filing may receive a different response after an update.
For example:
| Filing Stage | Example Status | Operational Meaning |
|---|---|---|
| Initial submission | ACT | Assessment complete; approved to proceed |
| Amendment submitted | Under assessment | Updated information is being reviewed |
| Updated assessment | ACW | Assessment complete with comments |
| Updated assessment | RFI | Additional information required |
| Updated assessment | DNL | Do Not Load |
| Missing child filing | PSF | Pending Sub-Filing |
An earlier ACT should never be treated as automatic approval of a later amended version.
The latest assessment response must be monitored.
4. How Should Freight Forwarders Handle Vessel Rollovers and Split Shipments?
Vessel rollovers are among the more complicated MPCI update scenarios.
A rollover may cause part of a shipment to move to another vessel or voyage, which can affect both the Master Bill and House Bill filing structures.
Scenario 1: One Container Is Rolled Over to Another Vessel
Consider an original shipment containing two containers:
-
Container 1: Vessel A;
-
Container 2: Vessel A.
Due to a carrier schedule change, Container 2 is moved to Vessel B.
The shipping line must reflect the split at the carrier bill level.
The NAIC specification supports different arrangements, including:
Option A: Keep the Original Bill
-
Retain the original carrier bill for the original shipment;
-
Submit a separate shipping line bill for the split cargo;
-
Reference the original bill in the new filing.
Option B: Update the Original Bill
-
Update the original carrier bill to reflect the revised shipment arrangement;
-
Submit another bill for the separated cargo;
-
Reference the updated original bill.
The appropriate option depends on how the shipping line processes the split.
Scenario 2: The Split Also Affects House Bills
If the split affects both the carrier's Master Bill and the forwarder's House Bill, the freight forwarder must also review its own filing structure.
For example:
An NVOCC has two containers under one HBL. One container remains on Vessel A, while the other is moved to Vessel B.
The forwarder may need to:
-
Retain the original House Bill and submit another House Bill for the separated cargo; or
-
Update the original House Bill and submit a separate House Bill for the split cargo.
The new filing must maintain the appropriate references to the original House Bill and the relevant split Master Bill.
These arrangements should be coordinated with the carrier and any master co-loader.
The NAIC Message Implementation Guide (MIG) provides the technical messaging requirements for the different split scenarios.
Important: A vessel rollover should not be treated as a simple vessel-name correction if the cargo itself has been divided between different vessels or voyages.
5. How Should RFI and DNL Responses Be Handled After an Amendment?
An MPCI amendment may generate a new assessment response.
Freight forwarders should understand the difference between the main response types.
ACT — Assessment Complete
The filing has completed assessment and is approved to proceed with loading.
ACW — Assessment Complete with Comments
The filing is approved, but NAIC has provided additional comments.
The comments should be reviewed and considered for future data quality improvements.
RFI — Request for Information
NAIC requires additional information or supporting documents.
Common reasons may include:
-
Incomplete shipment information;
-
Unclear cargo descriptions;
-
Inconsistent party details;
-
Additional supporting documents required;
-
Information that needs further verification.
The filer should review the specific RFI instructions, obtain the missing information and submit an updated version or the requested attachment.
If multiple RFIs are received for different versions, the latest RFI should be followed. NAIC's specification states that the latest request includes previous requests and attachment requirements.
DNL — Do Not Load
DNL indicates that the shipment is not approved for loading.
The responsible parties must address the issues identified by NAIC.
If DNL is received after loading, the NAIC specification states that the shipment should be intercepted upon arrival.
This is particularly important because an amendment can trigger reassessment even after the original filing received ACT.
PSF — Pending Sub-Filing
PSF indicates that the required House Bill filing or sub-filing information is missing.
This commonly occurs in consolidation or co-loading arrangements.
For example, a shipping line or master co-loader has submitted its bill, but the expected freight forwarder or sub-co-loader has not completed the corresponding House Bill filing.
The missing filing must be completed before the overall filing process can proceed.
EXP — Filing Expiry
An MPCI filing may expire when required actions remain incomplete for the applicable period.
According to the NAIC specification, updates submitted after 200 days from the initial filing will be rejected.
An expired filing cannot continue through the normal update process and requires the shipment data to be submitted again.
6. Does Every Amendment Require a New Bill of Lading Number?
No.
An updated version of an existing filing and a new bill of lading are two different operations.
Under the NAIC specification:
-
An update modifies an existing filing.
-
A new bill creates a separate filing.
-
A cancelled filing cannot be updated.
-
A filer can only update its own filings.
-
Two active filings with the same bill of lading number cannot be submitted by the same entity simultaneously, except where the previous filing has been cancelled or expired.
For significant changes, NAIC expects explanatory notes where necessary to justify the update.
The filing operator should therefore determine whether the shipment requires an amendment, a new bill or a cancellation before submitting another message.
Repeatedly resubmitting the same data without a valid change may also create duplicate filing problems.
7. MPCI Amendment Management Checklist for Freight Forwarders
To reduce operational errors, freight forwarders and NVOCCs should establish a standard amendment management procedure.
Before submitting an amendment
-
Confirm the original bill of lading number.
-
Identify the party responsible for the original filing.
-
Check the latest MPCI assessment response.
-
Identify exactly which shipment details have changed.
-
Obtain supporting information from the shipper, consignee or carrier.
-
Confirm whether the change affects the Master Bill, House Bill or both.
During submission
-
Select the correct update or new filing operation.
-
Ensure that revised information matches the latest transport documents.
-
Include explanatory notes where appropriate.
-
Check the parent bill reference and relevant shipment relationships.
-
Avoid duplicate submissions.
After submission
-
Monitor the new NAIC assessment response.
-
Follow the latest response rather than relying on an earlier ACT.
-
Resolve outstanding RFI or PSF requirements.
-
Escalate any DNL response immediately.
-
Retain the original filing, updated versions and supporting correspondence.
A well-defined process makes it easier for different operations teams and overseas partners to handle shipment changes consistently.
8. How Can Navigator International Support UAE MPCI Amendment Management?
For overseas freight forwarders and NVOCCs, MPCI compliance requires more than the initial transmission of cargo information.
Shipment changes can happen at any stage of the transportation process.
Navigator International works with Junri Tech to support overseas logistics companies with UAE MPCI filing and related manifest operations.
Depending on the agreed service scope, support includes:
-
UAE MPCI filing coordination;
-
House Bill of Lading data submission;
-
Shipment information review;
-
Filing status monitoring;
-
Amendment and correction coordination;
-
RFI information follow-up;
-
Vessel and voyage change coordination;
-
Consolidation and co-loading data coordination;
-
Online submission and batch data processing.
For companies handling frequent UAE-bound shipments, having a defined amendment workflow can help reduce communication gaps between freight forwarders, co-loaders and shipping lines.
Navigator International can also support related overseas manifest filing requirements, including AMS, ISF, ACI, EMF, AFR and ICS2.
The exact service scope, filing authority and responsibility for each update should be confirmed before shipment processing begins.
Frequently Asked Questions
1. Can an MPCI filing be amended after receiving ACT?
Yes. NAIC allows updates after an ACT response. However, every update triggers a new assessment, and the latest response must be followed.
2. Can MPCI information be updated after vessel loading?
Yes. NAIC allows updates after the initial pre-loading submission, including after loading and, in certain circumstances, after arrival in the UAE. However, a post-loading DNL response may require the shipment to be intercepted upon arrival.
3. What happens if the vessel or voyage changes after MPCI submission?
The filing party should update the existing bill or cancel it and submit a new bill, depending on the actual shipping arrangement. The carrier and forwarder must coordinate any affected Master and House Bill references.
4. Does a vessel rollover always require a new HBL?
Not necessarily. The appropriate procedure depends on whether the split affects the Master Bill only or both Master and House Bills. NAIC provides different procedures for these scenarios.
5. What should a freight forwarder do after receiving an RFI?
Review the specific request, obtain the missing information or supporting documents, submit the updated information and monitor the latest assessment response until the outstanding request is resolved.
6. Can a cancelled MPCI filing be amended?
No. According to the NAIC specification, a cancelled filing cannot be updated. A new filing is required.
7. How long can an MPCI filing remain open for updates?
The NAIC specification identifies a 200-day expiration period from the initial filing. After expiration, further updates to that bill are rejected, and the shipment data must be submitted again.
Final Takeaway
MPCI compliance does not end when the initial bill of lading receives an ACT response.
Vessel changes, cargo corrections, consignee amendments, shipment rollovers and split bills may all require further action.
For freight forwarders and NVOCCs, the most important operational controls are:
-
Submit the initial bill of lading within the applicable pre-loading deadline.
-
Update the filing whenever relevant shipment information changes.
-
Coordinate Master Bill and House Bill amendments.
-
Monitor the latest NAIC assessment response.
-
Resolve RFI and PSF issues and act immediately on DNL notifications.
A structured amendment management process helps overseas logistics companies maintain consistent shipment records and reduce operational disruption on UAE routes.
Navigator International supports overseas freight forwarders and NVOCCs with UAE MPCI filing coordination, amendment support and global manifest compliance services.
Official References
-
National Advance Information Center (NAIC), UAE MPCI Business Specification Document V1.0, Section 6.2 — Updating a Bill of Lading.
-
NAIC MPCI Business Specification Document V1.0, Section 6.2.3 — Split Bill of Lading Handling.
-
NAIC MPCI Business Specification Document V1.0, Section 6.2.4 — NAIC Assessment Responses for Updates.
-
NAIC MPCI Business Specification Document V1.0, Section 4.5 — MPCI Shipment Assessment.
-
Maersk, UAE Advance Cargo Manifest Implementation — Operational Guidelines, updated September 24, 2026.
Related Reading
-
UAE MPCI Portal or Accredited Service Provider: How Should a Foreign NVOCC Decide?
-
UAE MPCI Direct BL or Master BL: How Should a Foreign NVOCC Decide?